  • Conceptual studies for Labrador Iron Mines(Scheduling, OPEX and CAPEX Estimation, Report) - Amec Foster Wheeler
  • Pre-Feasibility Studies for Arcelor Mittal(Pit Optimisation, Pit Design, Strategic Mine Planning, Scheduling, OPEX and CAPEX Estimation, Report) - Amec Foster Wheeler
  • Feasibility Study for Vale Voisey's Bay Project(Block Modelling, Cut-off Value Optimisation, Mine Planning and Scheduling, Equipment Selection, OPEX and CAPEX Estimation)- Amec Foster Wheeler
  • Various confidential Due Diligence projects  for Kinross Gold Corporation- Amec Foster Wheeler 
  • NI 43-101 Technical report writing for two Goldcorp mines (Redlake and Eleonore mine sites)- Amec Foster Wheeler
  • Vale Inco Copper Cliff Deep Feasibility Project, Sudbury, Ontario, Canada: Responsible for stope and underground infrastructure designs. Evaluated block model against stope design. Scheduled life of mine plan using EPS. Plotting of stope and infrastructure designs using mineCAD. - MineRP formely GijimaAst
  • Redlake Mine Feasibility Project, RedLake, Ontario, Canada: Responsible for stope design (Cut &Fill method and Longhole stoping method) and underground infrastructure designs. Evaluated block model against stope design. Scheduled life of mine plan using EPS. Scheduled their 18month to 5years plan using EPS and EPS Blend. - MineRP formely GijimaAst
  • St Ann Bauxite, Jamaica, Open Pit Design and Planning Project: Responsible for implementation and training of Mine2-4D, EPS, mineHaul and mine CAD. Analyzing haul distances and trucks selection. - MineRP formely GijimaAst
  • Barrick Gold, Helmo Mine, Marathon, Ontario, Canada: Responsible for implementation and training of Mine2-4D, EPS VIZ and EPS. - MineRP formely GijimaAst
  • Xstrata Copper, Kidd Creek Mine, Timmins, Ontario, Canada: Responsible for implementation and training of EPS VIZ and EPS. - MineRP formely GijimaAst
  • Vale Inco Creighton Phase 3 Project, Sudbury, Ontario, Canada: Responsible for stope and underground infrastructure designs. Evaluated block model against stope design. Scheduled life of mine plan using EPS. Plotting of stope and infrastructure designs using mineCAD. Scheduled their 18month to 5years plan using EPS and EPS Blend. - MineRP formely GijimaAst
  • SLDC Alluvial Diamond Feasibility Study, Sierra Leone: Responsible for fleet selection, long and short range plan.- CSA Global formerly CSA Consulting International
  • New Liberty Gold Limited (Mano River Resources), Liberia: Responsible for underground scoping study. - CSA Global formerly CSA Consulting International